
JM2U-02 · 4:324-frame sequence pending
2U Rack Case JM2U-02
The JM2U-02 is a 482 × 450 × 89 mm rack-mountable 2U chassis with a 4 mm aluminium front panel and 1.2 mm galvanized steel body. It supports EATX (30.5 × 33.5 cm), ATX and MATX motherboards, four 3.5-/2.5-inch drive bays, seven half-height PCIe slots, a 7.5 cm CPU cooler limit and either standard 1U/2U or 1+1 redundant power supplies, cooled by two 8 cm fans.
Form factor2U rack
Dimensions482 × 450 × 89mm
Applications
Chassis
Product dimensions482 (W) × 450 (D) × 89 (H) mm
MaterialFront panel 4 mm aluminium plate; chassis 1.2 mm galvanized steel
Compatibility
MotherboardEATX (30.5 × 33.5 cm), ATX, MATX
CPU cooler height7.5 cm
Power supplyStandard 1U/2U power supply, or 1+1 redundant
Storage & expansion
Drive bays4 drive bays (3.5-inch and 2.5-inch)
Expansion slots7 half-height PCIe
Cooling
Fans2 × 8 cm
Front panel
Front panel2 × USB 3.0, 1 LED power switch
Weight & packaging
Package57 × 54 × 17 cm
WeightNet 5.2 kg, gross 6.5 kg
| Chassis | |
|---|---|
| Product dimensions | 482 (W) × 450 (D) × 89 (H) mm |
| Material | Front panel 4 mm aluminium plate; chassis 1.2 mm galvanized steel |
| Compatibility | |
| Motherboard | EATX (30.5 × 33.5 cm), ATX, MATX |
| CPU cooler height | 7.5 cm |
| Power supply | Standard 1U/2U power supply, or 1+1 redundant |
| Storage & expansion | |
| Drive bays | 4 drive bays (3.5-inch and 2.5-inch) |
| Expansion slots | 7 half-height PCIe |
| Cooling | |
| Fans | 2 × 8 cm |
| Front panel | |
| Front panel | 2 × USB 3.0, 1 LED power switch |
| Weight & packaging | |
| Package | 57 × 54 × 17 cm |
| Weight | Net 5.2 kg, gross 6.5 kg |
What is the MOQ for this platform?
500 units for the standard build. Custom cable looms, housing colour or private-label plates start at 1,000 units.
Can the connector configuration be changed?
Yes. Connector count, gauge, sleeve colour and cable length are configurable at the ODM stage; drawings are issued for approval before tooling.
What is the lead time?
Samples ship in 10–15 working days. Volume production is 30–45 days from PO, subject to component allocation.


