
JM2U-03 · 4:324-frame sequence pending
2U Rack Case JM2U-03
The JM2U-03 is a 482 × 480 × 89 mm rack-mountable 2U chassis in galvanized steel with an aluminium-alloy front panel, for ATX and smaller motherboards. It holds three 3.5-inch drives (or two 3.5-inch + one 2.5-inch), two full-height PCIe slots and a standard ATX power supply, allows a 75 mm CPU cooler and is cooled by three 8025 fans.
Form factor2U rack
Dimensions482 × 480 × 89mm
Applications
Chassis
Product dimensions482 (W) × 480 (D) × 89 (H) mm
MaterialHigh-grade galvanized steel sheet (Maanshan Iron & Steel); aluminium alloy front panel
Compatibility
MotherboardATX (12 × 9.6 inch), M-ATX, ITX
CPU cooler height75 mm
Power supplyATX power supply
Storage & expansion
Drive bays3 × 3.5-inch, or 2 × 3.5-inch + 1 × 2.5-inch
Expansion slots2 full-height PCIe
Cooling
Fans3 × 8025
Front panel
Front panel2 × USB 2.0, power switch, reset switch, power LED, HDD LED
Weight & packaging
Package60.5 × 55 × 18 cm
WeightNet 5.6 kg, gross 7.1 kg
| Chassis | |
|---|---|
| Product dimensions | 482 (W) × 480 (D) × 89 (H) mm |
| Material | High-grade galvanized steel sheet (Maanshan Iron & Steel); aluminium alloy front panel |
| Compatibility | |
| Motherboard | ATX (12 × 9.6 inch), M-ATX, ITX |
| CPU cooler height | 75 mm |
| Power supply | ATX power supply |
| Storage & expansion | |
| Drive bays | 3 × 3.5-inch, or 2 × 3.5-inch + 1 × 2.5-inch |
| Expansion slots | 2 full-height PCIe |
| Cooling | |
| Fans | 3 × 8025 |
| Front panel | |
| Front panel | 2 × USB 2.0, power switch, reset switch, power LED, HDD LED |
| Weight & packaging | |
| Package | 60.5 × 55 × 18 cm |
| Weight | Net 5.6 kg, gross 7.1 kg |
What is the MOQ for this platform?
500 units for the standard build. Custom cable looms, housing colour or private-label plates start at 1,000 units.
Can the connector configuration be changed?
Yes. Connector count, gauge, sleeve colour and cable length are configurable at the ODM stage; drawings are issued for approval before tooling.
What is the lead time?
Samples ship in 10–15 working days. Volume production is 30–45 days from PO, subject to component allocation.


